Brevard MPO Logo

The Brevard Metropolitan Planning Organization

 

Transportation Planning for Florida's Space Coast

 
Downloads


Brevard MPO documents are provided in Adobe® PDF format unless otherwise noted. To view these files, you must have Adobe® Acrobat® Reader, which can be downloaded free from the Adobe® web site.

The most current documents can be downloaded below. Older documents can be found in the archives. If you prefer, you may order paper copies of documents by completing the document order form. Can't find what you're looking for? Contact MPO staff for assistance.

  Document
Links
  Required MPO Planning Documents      
  2025 Long Range Transportation Plan (LRTP) - Summary
  2025 LRTP Cost Feasible Projects - Map
  FY 2008-12 Transportation Improvement Program (TIP) ***NEW***
  Federal Obligations Report (from FDOT web site)
no archives
  FY 2009 Unified Planning Work Program (UPWP) *Draft download
  FY 2008 Unified Planning Work Program (UPWP)
  Yearly Documents      
 

2007/2008 Traffic Count
(includes 10 year historic counts)

no archives
  FY 2007 Annual Report
  2006 Project Priorities Status Report
more info
  2006 Project Priorities List, Amended 12/06
more info
  2005/06 State of the System Report
  2005 Transit Quality of Service Report
  Mulit-Year Documents      
  Public Involvement Plan (PIP) - New Feb 07
  Public Involvement Evaluation Handbook
  Greenways & Trails Master Plan Summary
  MPO Agreements
  News & Information Documents      
  Agendas (MPO, TAC/CAC & BPTAC)
  Getting to School Safely Brochure
  Transportation Update Newsletter
  What is the MPO? Brochure
  Other Documents (Study Reports, Misc. Data Reports)
  Maps

Traffic Counts

The MPO annually monitors the traffic levels on major arterial and collector roadways in Brevard County.  Traffic counts are generally taken between October and March, and are adjusted using FDOT Seasonal Adjustment Factors resulting in the Average Daily Traffic (ADT) for each roadway segment.  The counts are taken in 15 minute increments over 48 hours. The ADT represents the total number of vehicles, in all lanes, in both directions, traveling within a segment each day (24 hours). 

The historic traffic count list published each Spring contains ten years of data. Counts dating back to 1989-90 are available by contacting MPO staff.

Annual Report

The Annual Report provides abrief overview of the studies and accomplishments that occurred during the fiscal year (July 1 - June 30), including summaries of the completed and on-going planning projects and the MPO's operating expenditures.

State of the System Report

The State of the System (SOS) Report is a part of the overall Congestion Management System (CMS) Process developed for Brevard County. Throughout the year MPO staff, FDOT and local governments collect and share data on the CMS network.  This information is compared with the CMS performance measures to identify overall mobility trends and to locate and rank congested corridors.

Transit Quality of Service Analysis

The State of the System Report (SOS) includes the 2005 Transit Quality of Service (TQOS) analysis, which evaluates the performance of Spact Coast Area Transit (SCAT) fixed route services.

Public Involvement Documents

State and Federal laws require all MPO's to have procedures for receiving comment from and involving the public in the transportation planning process.  The Public Involvement Plan (PIP) is a guideline for public involvement activities to be conducted by the Brevard MPO. The PIP contains the goals and policies of the MPO for public involvement.

In addition to conducting public involvement activities, the MPO also recognizes the importance of evaluating the effectiveness of those activities.  Guidelines for this evaluation can be found in the Public Involvement Evaluation Handbook, which is adopted by the MPO in conjunction with the Public Involvement Plan.

For more information and to get involved, visit the Public Involvement page.

Agreements

The MPO is party to these agreements to provide transportation planning services

Interlocal Agreement for the Creation of the MPO - 3/15/2006
Staff Services Agreement with Brevard County - Coming Soon!
Interlocal Agreement Creating the Central Florida MPO Alliance - 12/21/2005

Meeting Agendas

MPO, TAC/CAC and BPTAC Agendas are generally prepared one to two weeks prior to the scheduled meeting, and are posted here a week before the meeting. You can receive MPO agendas by e-mail by choosing "E-mail me the MPO Agenda" on the document order form. If you have any questions regarding MPO, TAC/CAC or BPTAC agenda items, please contact MPO staff.

2008 MPO Agendas

January - No Meeting

February - Agenda / Full

March - Agenda / Full April - Meeting Cancelled
May - Agenda / Full June - No Meeting
July - Agenda / Full August - Agenda / Full
September- Agenda / Full October - Agenda / Full
November - Agenda / Full December - Agenda / Full

 

2008 TAC/CAC Agendas

January - No Meetings

February - Agenda / Full

March - Agenda / Full April - Meeting Cancelled
May - Agenda / Full June - No Meeting
July - Agenda / Full August - Agenda / Full
September- Agenda / Full October - Agenda / Full
November - Agenda / Full December - Agenda / Full

 

Newsletters

The Transportation Update newsletter is periodically produced to provide meeting announcements, transportation news and the status of planning projects and upcoming activities. Newsletters are distributed by mail and e-mail to anyone requesting to be added to the mailing list. Use the publications order form to sign-up now to receive newsletters and meeting announcements!!

Getting to School Safely Brochure

This brochure provides basic safety guidelines for parents and children going to and from school.  The brochure was developed by MPO staff in cooperation with the Brevard County School Board Transportation Office and the Community Traffic Safety Team.  Brochures are distributed to school children at the beginning of each school year.

Information Brochures

These brochures provide basic information about the Brevard MPO and the programs and processes of the MPO.  The brochures are developed by MPO staff and are distributed at regular MPO meetings and other public meetings.

Other Documents

Additional study documents and presentations can be found on the Archives page.

2008 MPO & TAC/CAC Meeting Calendar
2007 BPTAC Meeting Calendar
Babcock Street PD&E Study Implementation Plan - March 2004
NASA Blvd. Realignment Map - Dec 2002
North Melbourne Traffic Study Final Recommendations - Jan 2000
Palm Bay Parkway PD&E Study Alignment Map - Nov 2004
South Titusville Subarea Traffic Analysis Final Report - March 2003
SR A1A (Pineda to Port Canaveral) Corridor Study Recommendations - Feb. 2002

Maps, Presentations, Graphics

Brevard I-95 Project Map (2/28/08)
2025 LRTP Cost Feasible Projects
Brevard MPO Regionally Significant Roadways (includes SIS)
- Revised Mar 2007
FDOT Upcoming (2005/06 - 2009/10) Brevard Capacity Projects - Oct 2005
Greenways & Trails Master Plan Map - September 2003
Greenways & Trails Showcase Projects- September 2003
Palm Bay Parkway - Proposed Alignment Aerial - September 2007
State Roads in Brevard County
Upcoming Projects
- October 2006
Urban Area Boundary & Federal Functional Classifications

 

All content on this site is provided for public information and is subject to change at any time.
For additional information, please contact MPO Staff.

To report errors on this site, please contact the

.

©2006 Brevard Metropolitan Planning Organization